The house is almost complete! We are having a final clean today and tomorrow the concrete floor will be buffed. There are still a few minor tweaks but overall it is finished. We are hoping to close on Wednesday and move that weekend and we can't wait to get into this house. Apartment life definitely isn't as fun as I remembered it. We are ready to have more than 800 square feet to share and more than one bathroom.
Front entry & steps. The first step is a different color because it was freshly poured.
Close up of the front door and the massive door handles.
View from the front door looking down at the steps. The cut out's will be filled with a pea gravel of some sort
Concrete pavers connecting the two patios in the back yard. The pile of rocks is where the fire pit will be.
View from the street/end of driveway. The stone pillars were Barry's original design. They turned out awesome!
Interior View of the back splash and pot filler faucet.
View from the kitchen into the living area. The fireplace is stucco not paint.
Saturday, March 6, 2010
Friday, January 22, 2010
Interior & Exterior Updates
Exterior
The rock work is well under way and they will likely finish it this week. Once that is done the exterior will be just about finished! We will still need some wood staining done. The septic has started and the propane tank went in yesterday.
View From the Front
View of Back Patio
View of Rock Pillar (the wood part needs to be stained)
Septic Hole
Jeremy in the septic hole... Hello down there....
Propane and Propane Accessories
Up Close Rock
Interior
A lot has happened on the interior this week too. We have selected the tile for our kitchen back splash and master bathroom shower/floor. Our kitchen cabinets and master bathroom vanities were delivered and should be installed today. The house was textured and we are narrowing down the paint colors. We have also selected the wood flooring for the dining and tower room. The interior doors were also delivered and should go up this week or early next.
Interior Doors
M. Bath Toilet Room Door (not a great image of it but it has obscured glass)
Cabinets (such exciting pictures of them, right?)
Wood for the Ceilings
Kitchen Back Splash (it's Onyx stone)
Master Bath Shower Tiles (they circle one's are for the shower floor and the square's are for the walls)
We do have a different tile picked out for the master bathroom floor but no pictures of it yet.
Friday, January 15, 2010
Dry wall and Foam
Thursday, January 14, 2010
Do's & Don'ts
What we DO have as of today... Walls!
See picture of dry wall:
Isn't it exciting?
Also rocks were delivered today for the non-stucco exterior.
See picture of rocks:
See picture of dry wall:
Isn't it exciting?
Also rocks were delivered today for the non-stucco exterior.
See picture of rocks:
What we DON'T have: a camera. It is being held hostage by my wonderful husband who is still at work this evening. Please enjoy these images until I can get my hands on our camera and take some pictures of our house, not steal them from google images.
Also BIG props to our buddy Jake over at Fiberglass Insulators.
If you're in the market for insulation give him a call, he'll treat you right at a good price.
Saturday, January 9, 2010
House Updates
Other items that have been done but won't be seen for a while are as follows: majority of the lighting fixtures have been selected and received, m. bathtub received, 2nd bath vanity received, cabinets have been finalized and placed into production for kitchen and master bath vanities. Our front door is on track to be delivered the 1st week of February.
Stained floor photos:
Breezeway Metal Roof & Entry Metal Roof
Tower & Back of house being painted
Interior insulation
View looking from the great room into the kitchen. Once it warms up a bit here the foam can be sprayed and dry wall can go up.
Sunday, December 6, 2009
Stain, Paint , a Little Lath and a New Visitor
When we got to the house there was a small uninvited visitor. We opened several windows/doors and he finally took flight and left.
Wednesday, November 25, 2009
Rough Times
A lot of rough work has been complete since the last post. The framing is all but complete, only a couple of punch items remain. All of the doors have arrived except for the front door (we'll explain the story behind its slow arrival at another time). The roof is 90% finished and is on hold until the stucco sections have been completed. The plumbing and electric rough are complete. The shower pan has been fiber glassed to prevent future leaks. We got samples for the concrete stain to ponder. Most importantly the trash heap is now contained in a dumpster. This past weekend I enlisted my brother and wife to help me run the internet, speakers, and cable lines. When you see them ask them about how much fun it was and if they are contemplating a career move.
Laundry room sink
Concrete stain options..........
and sneakers.
Plumbing central.
Second bath
Master shower with fiberglass
Living room home of the future fireplace
HVAC ducts
Sunset from the tower