The house is almost complete! We are having a final clean today and tomorrow the concrete floor will be buffed. There are still a few minor tweaks but overall it is finished. We are hoping to close on Wednesday and move that weekend and we can't wait to get into this house. Apartment life definitely isn't as fun as I remembered it. We are ready to have more than 800 square feet to share and more than one bathroom.
Front entry & steps. The first step is a different color because it was freshly poured.
Close up of the front door and the massive door handles.
View from the front door looking down at the steps. The cut out's will be filled with a pea gravel of some sort
Concrete pavers connecting the two patios in the back yard. The pile of rocks is where the fire pit will be.
View from the street/end of driveway. The stone pillars were Barry's original design. They turned out awesome!
Interior View of the back splash and pot filler faucet.
View from the kitchen into the living area. The fireplace is stucco not paint.
Saturday, March 6, 2010
Subscribe to:
Posts (Atom)