A lot of rough work has been complete since the last post. The framing is all but complete, only a couple of punch items remain. All of the doors have arrived except for the front door (we'll explain the story behind its slow arrival at another time). The roof is 90% finished and is on hold until the stucco sections have been completed. The plumbing and electric rough are complete. The shower pan has been fiber glassed to prevent future leaks. We got samples for the concrete stain to ponder. Most importantly the trash heap is now contained in a dumpster. This past weekend I enlisted my brother and wife to help me run the internet, speakers, and cable lines. When you see them ask them about how much fun it was and if they are contemplating a career move.
Laundry room sink
Concrete stain options..........
and sneakers.
Plumbing central.
Second bath
Master shower with fiberglass
Living room home of the future fireplace
HVAC ducts
Sunset from the tower