Sunday, November 15, 2009

Roof, Eaves and Porches




 The framers are finishing up their wook on the porches and starting the breezeway. You can see the rough outline of the breeze way to the right.  The shingles got delivered and the roofers have started. Most of the tongue and grove wood under the eaves is finished. We spent a lot of time this weekend picking out the stone, stucco and trim colors. As well as debating what lights should go where for the electric rough.












The Front porch with the exposed rafters and sleepers was started and finished.


The finished product before the metal roof. In the interim the wood will be protected  while the stucco and stone is applied so that the metal roof or the wood is not damaged.







The finished rafter tail detail.










Back of the house with the back porch protected.

1 comment: